Scope of Supply
The supply includes the provision of testing and commissioning of one RTU, comprising a traction transformer and the arrival (MT), including all part of DC and all internal signalling substation.
Overall System Architecture
System Description
In the settings and test was included the following equipment:
- 2 UC 500E REDUNDANTES EFACEC;
- CONTROL PANEL EFACEC;
- WITCH PERIPHERAL ATEN;
- 2 REDUNDANT SWITCH MOXA;
- PC INDUSTRIAL ADVANTECH;
- 6 SEPCOS NG integration;;
- 3 ABB 542 PLUS integration;
- 3 ACQUISITION OF UNITS DCU 500 with inputs (8020), outputs (8050) and measures (8080) EFACEC.
Description of Activities
The ENGIPROT team was responsible for the analysis of existing configurations of RTU and its adaptation to the features required by the customer.
In work the team ENGIPROT held all functional tests in the presence of supervisors of RPA under the coordination of EFACEC ENGINEERING.
Benefits for the Client
With the inclusion of ENGIPROT in the team of commissioning tests EFACEC ensured a precise realization of commissioning tests, allowing the reducion of the final project completion.




