
PowerLEAP – Qualificação e Expansão Internacional da ENGIPROT
O projeto visa aumentar a competitividade da empresa, garantir a entrada em novos mercados, criar emprego qualificado e consolidar a ENGIPROT como uma referência em
Where engineering gains visibility.

O projeto visa aumentar a competitividade da empresa, garantir a entrada em novos mercados, criar emprego qualificado e consolidar a ENGIPROT como uma referência em

Training in Protection, Control, and Command Systems (PCCS).

Parameterisation and final testing of the ABB REF 620 Interconnection Protection, prior to offshore transfer and grid connection.

ENGIPROT successfully completed the approval process of an RTU (Remote Terminal Unit) device with REN, applicable to the integration of systems with

ENGIPROT and iGrid T&D have established a technical and commercial partnership, with ENGIPROT serving as the exclusive distributor and integrator of this manufacturer in Portugal.

Electrical studies for the Morgavel Photovoltaic Solar Power Plant, located in the municipality of Sines.

Technical audit of all protection parameters, High and Medium Voltage, at GALP’s Sines refinery.

Technical audit of the protection system at the Ikea Industry factory in Paços de Ferreira, Portugal.

The scope of supply included the provision of study, configuration, parameterisation, and commissioning testing services for EDP of the Protection Relay associated with the

The supply includes the provision of investigation, configuration, parameterisation, testing, and commissioning services for a mobile substation in Costa Rica with voltage levels

The supply includes the provision of training services on X420 range equipment and the Winprot 4 configuration software.

The scope of supply included the provision of study, configuration, parameterisation, testing, and commissioning services for two substations in Paraguay with voltage levels of

The scope of supply included the provision of configuration, parameterisation, testing, and commissioning services for 3 RTUs, consisting of a bank of capacitor transformers

The scope of supply included the provision of testing and commissioning services for an RTU, consisting of a traction transformer and part of

The scope of supply included the provision of final parameter configuration services, end-to-end testing of the Line Differential Protection, and supervision of the commissioning of

The supply includes the provision of research, configuration, parameterisation, and factory testing services with Siemens Protections for the rehabilitation of Hydroelectric Power Plants in

The supply includes the provision of testing and commissioning services for 13 RTUs, 4 of which are associated with the entire substation, including a traction transformer.

Commissioning support for the K30 220/66/23 kV substation for ANDE, Ciudad del Este, Paraguay.

The supply includes the provision of a protection coordination study for the extension of the Matambo Substation in Tete, Mozambique.

The supply includes the provision of investigation, configuration, parameterisation, testing, and commissioning services for a mobile substation in Morocco with voltage levels of

The scope of supply included the provision of study, configuration, parameterisation, testing, and commissioning services for the Protections of the Combined Cycle Power Plant, Luanda Refinery.

The scope of supply included the preparation of the technical specifications document for the Protection, Command, and Control System (PCCS) to be integrated into the preliminary project.

The scope of supply included the provision of design and drafting services for the standard schematics of the Protection, Command, and Control panels of the

The scope of supply included the provision of study, configuration, parameterisation, and commissioning testing services for EDP of the Protection Relays associated with the

The supply includes the technical audit and coordination of protection studies at the Alenquer IV Pumping Station.

The scope of supply included preventive maintenance testing of 30 kV and 6 kV equipment at the Alenquer IV Pumping Station.

The supply included the analysis of the existing situation and the development of a technical report on the problems identified, together with the proposed actions to
A ENGIPROT utiliza cookies para assegurar o bom funcionamento do website e melhorar a experiência do utilizador. Pode aceitar, recusar ou definir as suas preferências de cookies a qualquer momento. Veja a nossa Política de Privacidade.